Routine Tests
				   
				   
					   
					   
The following routine tests are carried out on each transformer before leaving the factory.
					   
					   
					   - Include Voltage test (Insulation test.)
 
						   
					   - Separate source over voltage test (high voltage test.)
 
						   
					   - Iron loss test (no load test.) 
 
						   
					   - Copper loss test (full load test.)
 
						   
					   - Turn ratio test.
 
						   
					   - Vector Group test.
 
						   
					   - Oil testing of transformer as per IEC-296.